Production of the test mold sets
and prototypes products

FROM MODEL TO THE PRODUCT GLASS

  • Production of the test mold sets 15 days from the date of approval of the design documentation.
  • Photo trial engraving and imprint it in plastic for added control.
  • A careful analysis of the issues raised in the test batch production, keeping them in the production of a complete mold sets.